Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Site DevelopmentCall

Florida

In Florida, Stormwater Comes Before the Building

Retention consumes a real share of a site and it is not optional. A scheme laid out with the building first and retention fitted into what is left over is a scheme that gets redrawn — and the redraw costs yield that a retention-first layout would have kept. The order those two are designed in changes the answer.

The survey, the geotechnical report and what you intend to build. That is enough to tell you what the site work involves.

ValleyHalf the water on the roof runs hereWall flashingWhere a roof meets a wallPenetrationsVents, stacks, skylightsEaveWhere wind lifts first

Four places account for most South Florida roof leaks. None of them is the middle of the roof.

Retention

In Florida it takes real acreage, before the building

Self-perform

Dewatering and deep foundations in house

Yield

The site work decides how much you can build

Licensed

General contractor, licensed in the state of Florida

The difference

How we work

Stormwater comes before the building, not after it

In Florida, retention consumes a real share of a site and it is not optional. A scheme laid out with the building first and retention fitted into what is left over is a scheme that will be redrawn — and the redraw usually costs yield.

The horizontal work is where budgets go wrong

Owners price the building carefully and estimate the site work. On a Florida site, clearing, grading, drainage, utilities and paving are frequently a much larger share than expected, and the gap appears at bid.

We self-perform the wet part

Dewatering and deep foundations are ours. On a Florida site with a shallow water table, that means the largest single schedule risk on the horizontal package belongs to the same contract you do.

We will tell you the yield is not there

Once retention, setbacks, access and parking are laid out honestly, some sites do not support the program in the pro forma. Saying so during due diligence costs us the project and saves you the land.

Start here

Send us the survey

The survey, the geotechnical report and what you intend to build. That is enough to tell you what the site work involves.

If the yield is not there once retention, setbacks and parking are laid out honestly, we would rather say so during due diligence than after you own the land.

FAQ

Common questions

Why is site work underestimated?
Owners price the building carefully and estimate the site. On a Florida site, clearing, grading, drainage, utilities and paving are a larger share than expected.
How much land does stormwater retention take?
A real share, driven by impervious area and soil conditions. It should be laid out before the building, not after.
What makes earthwork expensive?
Import and export. A balanced site moves dirt around; an unbalanced one pays for trucking on every load.
Why is unsuitable material so costly?
Every cubic yard is paid for twice — excavated and hauled away, then replacement bought, hauled in and compacted.
Are services in the road enough?
Available and adequate are different things. Confirm actual capacity with each utility in writing during due diligence.
Will you price from a thin geotechnical report?
No. It would be a guess, and a guess becomes a change order.
Why does paving fail?
Almost always the subgrade or the drainage, not the asphalt. Surface repairs to a subgrade problem fail too.
Does site work need its own permits?
Yes, from more agencies than the building, and frequently in sequence. Until site approval exists, nothing starts.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.